SACRAMENTO (CBS13) — Sacramento City Councilmembers volition see a program this week to dilatory down drivers successful residential neighborhoods.
They’re expected to ballot connected the 2021 velocity lump task during Tuesday’s metropolis assembly meeting.
It includes plans for much than 50 velocity lumps – which are modified velocity bumps that let exigency vehicles and buses to walk done but necessitate astir different drivers to dilatory down.
Each velocity lump costs astir $4,000 connected average. The programme would full astir $208,000, including signage and striping, and it would beryllium paid for with backing from the city’s imaginativeness zero information programme – truthful nary wealth from the wide money would beryllium used.